1961Started oil seal manufacturing and sales.
-
1974Technical Joint venture established with Japanese company, upgraded Taiwan’s seal technique.
-
Established new company, land area 12000 ㎡. No.1 factory 3000 ㎡, promoted our own logo ‘TTO’ all over the world. Currently, ‘TTO’ has been registered in 60 countries.
-
1986Developed vacuum forming manufacturing, reduced bubble problem in rubber. This patented technique has been followed as the standard process for high quality sealing products.
-
1994Expanded 2nd factory 1600 ㎡.
-
19952nd factory completed. Introduced spring joint machines from Japan and Rubber extruding machine from the UK,More automatic facilities for higher capacity.
-
1996Introduced ISO9002 quality assurance system.
-
1997Awarded ISO9002 by British company BSI.
-
1998Expanded 3rd factory (2-5 floors 6500 ㎡)
-
2000Invested in quality control equipments: low temperature tester, salt water tester, 2D measurement, Lip pressure checking (LOP), 2000X microscope, Infrared Spectroscopy (FTIR), etc.
-
2002Expanded office building (1-5 floors 2100 ㎡). Introduced QS9000 quality assurance system.
-
2003Awarded ISO9001 & QS9000 by British company BSI.
-
2004Expanded new factory (1-5 floor,10000 ㎡). Increased metal case surface treatment capacity & environment protection
-
Invested visual inspection machine fron Italy
-
2007Expanded quality/R&D building (1-3 floors 710 ㎡). Bought new land : 12000 ㎡
-
2008Expanded office building (1-4 floors 1600 ㎡)
-
2009Completed new warehousing building (B1-8 floors 16000 ㎡).
-
Completed computerized warehousing system. (Max capacity: 100,000 cells)
-
Invested in CNC equipment for precision parts. Invested in automatic packaging machine
-
2015Set up in-house E-work station.
-
2016Bought new land: 2800 ㎡. Invested in automatic bonding equipment, upgraded metal case treatment process, Upgraded computer server to VMWARE, set up online back-up system.
-
Bought CCD Optical automatic inspection machine, decreasing the needs for manual quality inspection and increasing overall product quality.
-
2018Expanding new factory (1-5 floors 9500 ㎡.)